Market analysis of 7 November 2026
Annual renewable energy is the sum of many operating intervals. Solar and wind output depend on the supplied weather, equipment conversion and the timing of site demand. A useful study keeps that chain visible instead of jumping from nameplate capacity to a single annual yield.
Our example is Network Map’s completed weather-conversion case reviewed on 7 November 2026. It uses a full synthetic 2026 weather year with 8,760 hourly intervals. The Asset Screening documentation identifies the exact saved run and its modelled results.
Define The Equipment And The Weather Axis
The case contains 2 kW solar, 2 kW wind and a 2 kW / 4 kWh battery, serving 8,760 kWh of annual load. The synthetic solar inputs follow a daily sun path and a repeating cloud factor. The wind inputs vary through the day and by season.
Solar irradiance channels, solar angles and module temperature share the same timestamp axis. The solar setup uses a DC/AC ratio of 1, reference irradiance of 1,000 W/m², reference temperature of 25°C, a temperature coefficient of −0.004 per °C and inverter efficiency of 1. These are explicit conversion assumptions, not values inferred from the nameplate rating.
Wind speed is supplied at 10 m, ranging from 0 to 9.5 m/s. Hub height is 40 m and the shear exponent is 0.5. In this authored example, the height conversion doubles the supplied speed. The power curve reaches half rated power at 10 m/s and full rated power at 20 m/s.
Read The Generation Mix
The completed run reports 3,241.12 kWh of solar and 7,787.57 kWh of wind. Reported total generation is 11,028.68 kWh. The component values and total are independently rounded to two decimal places.

The wind contribution is larger in this particular synthetic year. That result follows from the supplied weather and conversion curve. It is a characteristic of this case, so the same workflow should be rerun with the weather and equipment evidence for the site under review.
The solar path is zero during all 4,381 night hours. Its output stays below the 2 kW AC ceiling, and reported clipped energy is 0 kWh. These checks connect the aggregate yield back to the physical behaviour expected from the supplied inputs.
Annual Surplus And Hourly Imports Can Coexist
Annual generation exceeds annual load, yet the site still imports 519.34 kWh. It also exports 2,737.07 kWh. The reported self-sufficiency is 94.07%. Hourly timing explains why an annual surplus does not automatically eliminate grid purchases.

The battery operates inside this chronological balance. Review generation, demand, storage movement and grid exchange together. An annual difference between generation and load is not a substitute for the interval ledger, because equipment losses and inventory movements also belong in that ledger.
That is the practical value of weather conversion: it preserves the shape that drives site imports, exports and storage use. A single annual yield cannot show when those exchanges occur.
Retain A Reproducible Resource Case
- Keep the weather source, complete timestamp axis and channel units together.
- Bind the exact solar and wind equipment versions to the case.
- Check night output, equipment ceilings and full-year totals.
- Retain the saved run and weather-input digest when comparing alternatives.
Follow Asset Screening for weather conversion and Profiles And Inputs for chronological inputs. Use Project Modelling to connect the energy result to project economics, and Curtailment By Cause for a separate view of observed market conditions.