How the Grid Treats a Site: Broken Hill, NSW

Know how the grid treats a site before you commit: the constraints, outages, curtailment and loss-factor revenue behind it, on the line where they happen. Here is the whole screen for one real area, with every figure dated.

Operator data, never estimated • ISO/IEC 27001 certified • Cancel anytime

Six Steps, One Area

Broken Hill sits at the far western end of the NSW1 regional network, 220 kV from Buronga. It already hosts a solar farm and a wind farm, which makes it a useful test of what a new connection would face. All figures were read on 1 Nov 2026.

Find the Network

Search the town, then let the map load the network operator's layers: substations, transmission lines and existing generation.

  • Broken Hill 220/22 kV terminal station
  • The 220 kV X2 line south to Buronga Switch
  • Silverton wind farm to the north-west
  • Analyst plan, US$75/month
Network Map around Broken Hill: the Broken Hill 220/22 kV terminal station, the 220 kV X2 line south to Buronga, the line east, and the Silverton wind farm area to the north-west
Step 1: Broken Hill on the map, 1 Nov 2026.

Read the Constraint Headroom

Open Grid Constraints and select the path. The X2 line maps to constraint equation N>NIL_X2.

  • 36.3% of the limit, headroom 260.5, band “loose” at 9:35 pm AEST
  • Mean 13.9% over 3,871 five-minute intervals, 19 Oct – 1 Nov 2026
  • Peak 53.33% (19 Oct 2026, 10:10 am AEST); history back to January 2024
  • Pro
Network Map Markets Constraints view with the Buronga Switch to Broken Hill (X2) 220 kV path selected: signed ratio 36.3%, headroom 260.5 (loose) at 1 Nov 2026 9:35 pm AEST, and its signed utilisation history for October 2026 with median and average references
Step 2: the X2 path in the Constraints view, 1 Nov 2026, 9:35 pm AEST.

See Which Constraints Bind on the Units Already There

X2 itself ran loose, but the units at Broken Hill were still constrained: by their own connection and transformer limits and by wider-area constraints.

  • Broken Hill Solar Farm: proving constraints include N>NIL_BHTX_LV, N_BROKENHSF_FLT_30 and N_BROKENH1_0INV
  • Plus frequency control constraints such as F_I+TTS_TG_R5 and F_MAIN+TTS_TG_R60
  • Pro
Network Map Markets Constraint Equation Analysis for L_PEC_X_6C_6G_6H_XST on 1 Nov 2026: left-hand and right-hand sides equal in 45 of 73 five-minute dispatch intervals, latest dispatch 9:20 pm AEST, with the P30 forecast after it
Step 3: the equation binding in the Buronga area on 1 Nov 2026, L_PEC_X_6C_6G_6H_XST, by 5-minute dispatch interval.

Measure Curtailment Nearby

Curtailment by Cause, NSW1 region, the 30 market days to 31 Oct 2026.

  • Broken Hill Solar Farm: 839.1 MWh curtailed of 9,652.5 MWh available (8.7%), all network-caused, A$54,671 at the regional price
  • Silverton Wind Farm: 388.1 MWh (1.1%), network-caused, A$17,552
  • Pro
Network Map Markets curtailment by unit for the NSW1 region with the Broken Hill Solar Farm row highlighted: 839.1 MWh curtailed, 8.7% share, 54,671 dollars missed revenue, network constraint cause, high confidence
Step 4: Broken Hill Solar Farm in Curtailment by Cause, 30 days to 31 Oct 2026.

Check the Outages

Network Outage Constraint Sets shows every scheduled outage linked to a constraint set, seven days back and 90 ahead.

  • 222 constraint sets and 687 schedule records in the window, 1 Nov 2026
  • Buronga lines 6C, 6G and 6H: outage set N-X_6C_6G_6H, scheduled to end 4 Nov 2026, 06:00 AEST
  • Pro; unit risk via API
Network Map Markets Network Outage Constraint Sets view: 222 constraint sets and 687 schedule records over the previous seven days and next 90, with a network outage schedule timeline per constraint set
Step 5: Network Outage Constraint Sets, 1 Nov 2026, 8:45 pm AEST.

Apply the Loss Factor

The published loss factor turns the regional price into what a unit at this connection point is actually paid for energy.

  • BROKENH1 2026-27 loss factor 0.8436; STWF1 0.896
  • October 2026: A$670,588.78 without the factor, A$565,708.70 with it (-15.6%)
  • Pro, available via API
Network Map Markets Regional Daily Price Profiles for the NSW1 region: dispatch price by time of day for 25 to 31 Oct 2026
Step 6: the NSW1 regional price that the loss factor scales, 25–31 Oct 2026.
Summary · figures read 1 Nov 2026

What This Screen Tells a Developer About Broken Hill

The 220 kV line out of Broken Hill ran well inside its constraint limit over the last fortnight. The existing solar farm was still curtailed 8.7% of its available energy in October by network constraints local to its own connection, and every MWh it sells is scaled by a 0.8436 loss factor, a 15.6% haircut against the regional price. A new project here would face the same loss-factor geography, which is the first question for its connection enquiry.

36.3%X2 at 9:35 pm AEST
8.7%Network curtailment, BROKENH1, Oct 2026
0.8436Published loss factor 2026-27
−A$104,880Loss factor effect, October 2026

Built from published market data for site screening, planning and analysis.

Who It's for

Connection and Development Analysts

Decide which sites deserve a formal connection enquiry, with dated evidence.

Engineering Consultants

Hand the study team the observed constraint, curtailment and loss-factor record for the area.

Investors Reviewing a Pipeline

See how the grid already treats the existing assets next to a proposed one.

What Each Step Needs

Analyst

Map, Substations and Lines

Steps 1: every network layer, spatial tools and uploads.

Pro

Constraints, Curtailment and Outage Sets

Steps 2 to 5: the Grid Constraints suite in Network Map Markets.

Via API

Loss-Factor Revenue and Unit Risk

Steps 5 and 6: available via API for Pro and Enterprise, set up on request.

Analyst US$75/month · Pro US$150/month

Start on Analyst for the map. Pro adds the decision evidence: constraint history, curtailment by cause and missed revenue, loss-factor revenue and outage risk.

See the Price. Start Today.

Start Free, Upgrade When You Need the Evidence

Analyst US$75 a month · Pro US$150 a month · Annual plans 15% off: US$765 and US$1,530 a year.

Self-serve: pay by card or company invoice, no demo needed · Cancel anytime