Charging economics starts at the meter, but the customer receives energy at the battery. Between those points sit conversion efficiency, charger occupancy and the sales agreement. Separating them makes both fleet planning and public charging studies easier to explain.

We use two Network Map screening examples reviewed on 7 November 2026. Both cover 1 November 2026 from 10:00 to 12:00 UTC. The inputs are authored assumptions and the results are modelled for that window.

Start With Energy Delivered

The fleet example has 2 vehicles and 1 charger rated at 10 kW. One vehicle session uses a 50 kWh battery, arriving at 20% state of charge and targeting 56%. Charging efficiency is 90%, and the supplied plan charges at 10 kW throughout the two-hour window.

The product reports 20 kWh drawn from the grid and 18 kWh delivered to the vehicle battery. The 2 kWh difference is derived from those totals. Adding the delivered energy to the starting battery inventory reaches the specified 56% departure target.

Follow Energy Across The Charger. Example fleet plan · 1 November 2026, 10:00–12:00 UTC. Grid energy: 20 kWh; Battery energy: 18 kWh; Derived difference: 2 kWh.
Example fleet plan · 1 November 2026, 10:00–12:00 UTC. Supplied plan: 10 kW for 2 hours at 90% charging efficiency. Source: Network Map.

Explore Project Modelling

This connects the departure requirement to a visible power-and-time plan. The session uses one charger at peak, so the charger count and battery-energy check can be read together. A site study can then add the connection limit and other coincident loads to the same time window.

Price Grid Energy And Sold Energy Separately

The separate on-demand example has 2 chargers at 10 kW each, the same 90% efficiency, 3 sessions and 2 occupied charger-hours. It uses 20 kWh of grid energy and sells 18 kWh. The authored rates are AUD 0.20 per grid kWh, AUD 0.50 per sold kWh and AUD 1 per session.

Energy sales are AUD 9 and session sales are AUD 3, making AUD 12 of total sales. Grid energy costs AUD 4. The resulting energy margin is AUD 8 for the supplied two-hour window.

Build The Charging Window Margin. Separate on-demand example · same two-hour window. Energy sales: 9 AUD; Session sales: 3 AUD; Grid energy cost: -4 AUD; Energy margin: 8 AUD.
Separate on-demand example · same two-hour window. Margin = 9 + 3 − 4 = 8. Capital and annual fixed costs are separate. Source: Network Map.

The calculation deliberately uses different volumes for energy purchased and energy sold. Applying the retail rate to grid purchases would overstate sales when charging losses are present. Session charges belong in their own line because their driver is the number of sessions, not energy volume.

Give Utilisation A Defined Denominator

Two chargers available for two hours provide 4 charger-hours. The supplied 2 occupied charger-hours therefore produce a utilisation fraction of 0.5, or 50%. That measure describes charger occupancy over the stated window.

Utilisation and energy margin answer different questions. Occupied time helps assess how the charging assets are used. Energy margin helps assess the supplied sales and energy purchases. Keep both beside the window dates so a short operating example is not mistaken for an annual result.

The authored capital inputs are AUD 1,000 per charger plus AUD 500 installation, for AUD 2,500 total capital cost. Fixed annual operating cost is AUD 100. These longer-horizon costs stay separate from the AUD 8 window energy margin until a dated project cash-flow study brings them together.

Move From A Charging Window To A Project Case

  • Specify vehicle arrival, departure and required battery energy.
  • Retain grid and battery energy as separate quantities.
  • Price sold energy and sessions using their own units.
  • Use a dated operating profile to connect repeated activity with capital and annual costs.

The Asset Screening guide contains the fleet and on-demand workflows. Value And Finance explains the project cash-flow layer. Add the applicable tariff evidence through Network Tariffs and review network context with Grid Constraints.