Market analysis of 7 November 2026
Electricity volume and electricity shape are different inputs. A site can use the same total energy while buying more of it in a lower-priced interval. The value of that move depends on the available flexibility, connection limit and tariff.
Our modelled example uses Network Map’s saved bounded flexible-load experiment, reviewed on 7 November 2026. It covers two one-hour UTC intervals on 1 January 2026. We also calculate an equal-split comparator directly from the same supplied rates and loads.
Define The Energy That Must Be Served
Each interval has 1 kW of fixed load. Flexible demand can range from 0 to 2 kW in either interval, and it must receive 2 kWh over the two-hour window. The import limit is 3 kW. The two energy rates are AUD 0.10/kWh and AUD 0.50/kWh.

These inputs define a small, transparent scheduling question. The flexible requirement must still be met. Moving it changes timing, not the amount of service delivered. The fixed load stays in place in both intervals.
The selected customer is assigned 75% of the tariff cost, with the owner assigned 25%. The saved objective minimises the selected customer’s allocated cost. Those cost shares do not change the actual tariff rates.
Move Flexible Energy To The Lower-Priced Interval
With 2 kW of flexible load in the lower-priced hour and none in the higher-priced hour, total imports are 3 kWh and 1 kWh respectively. The schedule reaches the import ceiling in the first hour and serves all required flexible energy.
Whole-site energy cost is AUD 0.30 plus AUD 0.50, or AUD 0.80. The selected customer’s 75% share is AUD 0.60. The saved product result returns an optimal objective of AUD 0.60, rounded, and an energy residual of 0 kWh. The derived owner share is AUD 0.20.

This reconstruction follows directly from the saved inputs and objective. It makes the economic reason for the schedule visible: the flexible quantity moves into the cheaper hour while the fixed quantity remains.
Compare The Same Energy With A Different Shape
For a transparent comparison, split flexible demand equally at 1 kW in each hour. Total imports are then 2 kWh in each interval. The site still purchases 4 kWh overall and serves the same 2 kWh flexible requirement.
This derived equal-split cost is AUD 0.20 plus AUD 1.00, or AUD 1.20. The customer share is AUD 0.90 and the owner share is AUD 0.30. Compared with that shape, the lower-cost schedule saves AUD 0.40 at the site, split into AUD 0.30 for the customer and AUD 0.10 for the owner.

The arithmetic comparator shows exactly why the saved objective has its reported value, using the same supplied rates and loads.
Carry The Same Discipline Into A Larger Study
- Keep the required energy fixed when testing a timing change.
- State the flexible power range and the connection limit.
- Retain the interval rates and their currency units.
- Separate the whole-site cost from any participant objective.
The Dispatch Calendars And Sizing guide explains the bounded participant experiment and its saved request. Use Participant Allocation for the money split, Profiles And Inputs for interval data and Markets for the separate market-price view.