Capacity studies benefit from a clear ledger between an asset’s nominal rating and the capacity assigned to a service request. Network Map provides a modelled preview that keeps the entered capacity assumptions and returned allocation together.

Network Map infrastructure view used as geographic context for Modelled Capacity: Trace The Inputs To Allocation.
Network Map infrastructure context for capacity studies.

Enter A Capacity Scenario

This standalone preview was run on 8 November 2026 for an example storage-service interval beginning at 00:00 UTC on 1 January 2026. All capacity, duration and ramp assumptions were supplied by the caller.

The entered asset has a 10 kW nominal rating. The caller supplies an 8 kW caller-attested capacity assumption, a 6 kW offer and a 4 kW accepted request. The preview uses the entered caller-attested capacity basis for the allocation calculation. The product records the capacity basis and its caller-attested evidence alongside the numbers.

Trace The Capacity Stages

The returned ledger shows 10 kW nominal capacity, 8 kW caller-attested capacity, 6 kW offered and 4 kW awarded. Requested and allocated capacity are each 4 kW. Available capacity is 10 kW.

Capacity Stages In The Modelled Preview. Example capacity scenario · 1 January 2026. Capacity · kW.
Example capacity scenario · 1 January 2026. Each stage is a distinct capacity field. Caller-attested capacity is the supplied scenario input.

Explore Network Map

These fields serve different roles. The nominal value describes the input rating. The caller-attested value supplies the scenario’s capacity basis. The offer and accepted request define the commercial quantities entered for the example. The allocated value is the modelled result for this standalone preview.

Keep Duration And Ramp Assumptions Visible

The caller supplies a required duration of 60 minutes and an available duration of 60 minutes. Required ramp is 1 kW per minute; available ramp is 2 kW per minute. The block-size input is 1 kW. Keeping these inputs beside the capacity ledger makes the scenario reproducible.

The Entered Ramp Assumptions. Example capacity scenario · 1 January 2026. Ramp · kW per minute.
Example capacity scenario · 1 January 2026. Required and available duration are both 60 minutes.

Take The Scenario Into Dispatch Review

The preview gives a compact allocation study before a dispatch review. Use the saved dispatch ledger to inspect physical delivery and shared resource use. This separates a modelled capacity allocation from the energy delivered by a time-based operating schedule.

Start with your asset rating, documented capacity assumption, offer, accepted request and operating limits. Read the Contracts And Settlement guide and the Dispatch, Calendars And Sizing guide to connect the scenario to the wider project workflow.