Market analysis of 8 November 2026
Hydrogen studies connect electrical demand, production, storage and product withdrawals. Network Map presents those flows in a single interval ledger, alongside the entered cost basis.

Define The Conversion Plan
This worked preview was run on 8 November 2026. It uses caller-supplied engineering and commercial assumptions for 00:00–00:30 UTC on 1 January 2026. The plant operates at 100 kW. Its entered conversion curve gives 40 kWh of plant electricity per kilogram at that operating point.
The returned production is 1.25 kg. Plant electricity is 50 kWh, with 1 kWh of auxiliary demand and 3.75 kWh of compression demand. Total electrical consumption is 54.75 kWh.

Reconcile The Hydrogen Inventory
The tank opens with 5 kg. Production adds 1.25 kg and the purchase input adds 1 kg. The plan delivers 2 kg, sells 1 kg and withdraws 1 kg for a fuel cell. Closing inventory is 3.25 kg. The returned mass-balance residual is zero.
Following opening and closing stock makes the delivery, sale and fuel-cell withdrawals explicit. Each use has its own quantity in the returned ledger.

Read Costs On The Entered Horizon
The example supplies an electricity price of AUD −0.20/kWh. Its electricity cost is AUD −10.95. The entered half-hour allocations are AUD 10 for capital, AUD 2 for replacement and AUD 3 for fixed operation. Purchased hydrogen costs AUD 8, variable production costs AUD 1.25 and water costs AUD 0.50.
The returned gross horizon cost is AUD 13.80. Sales revenue is AUD 12, leaving a net horizon cost of AUD 1.80. The modelled cost per delivered-and-sold kilogram is AUD 4.60 on that supplied allocation basis.
Bring The Physical And Financial Views Together
Set the conversion curve, tank limits, production plan and withdrawal priorities. Add price and cost assumptions for the same intervals, then review electrical demand, inventory and cost legs together. The Asset Screening guide explains the workflow in Project Modelling.