Market analysis of 8 November 2026

Fleet charging starts with a departure requirement, an available parking window and the power available at the depot. Network Map brings those inputs into a joint schedule and returns the charging energy, vehicle energy balance and site demand for each interval.

Network Map infrastructure view used as geographic context for Fleet Charging And Vehicle-To-Grid: Follow The Energy.
Network Map infrastructure context for fleet charging studies.

Set The Vehicle And Depot Inputs

This worked example was run in Network Map on 8 November 2026. Its caller-authored horizon covers 00:00–02:00 UTC on 1 January 2026. One vehicle has 10 kWh of usable energy, starts empty and needs 4 kWh for departure. The charger supplies up to 4 kW, within a 10 kW site import limit.

The example import prices are AUD 1/kWh in the first hour and AUD 2/kWh in the second. Charging and discharging efficiency inputs are both 1, and the entered throughput cost is zero. These are the saved study assumptions.

Read The Managed Schedule

The managed run schedules all 4 kWh in the first hour. Site import is 4 kW in that hour and zero in the next. The returned tariff cost and objective value are both AUD 4. The vehicle closes with 4 kWh and the departure shortfall is zero.

Charging In The Lower-Price Hour. Managed example · 1 January 2026 · UTC. kWh.
Managed example · 1 January 2026 · UTC. Saved modelled schedule. Input import prices: AUD 1/kWh, then AUD 2/kWh.

Explore Network Map

Add A Bidirectional Study

A separate bidirectional example starts with 4 kWh in the vehicle and uses a 4 kWh minimum reserve and closing target. The supplied discharge efficiency is 0.8. A caller-attested export-permission input allows up to 2 kW throughout the parking session. The second-hour export-price input is AUD 3/kWh.

The returned schedule charges 2.5 kWh in the first hour and exports 2 kWh in the second. It reports 0.5 kWh of loss, finishes at 4 kWh and meets the departure target. The returned tariff cost is AUD −3.50: the derived reconciliation is AUD 2.50 of imports less AUD 6.00 of exports. The entered throughput cost is zero.

Charging And Vehicle-To-Grid Export. Bidirectional example · 1 January 2026 · UTC. kWh.
Bidirectional example · 1 January 2026 · UTC. Saved modelled output. Export permission and prices are caller-authored study inputs.

Follow The Vehicle Energy Balance

The bidirectional rows connect charging, delivered export and losses to stored energy. Vehicle energy rises from 4 kWh to 6.5 kWh, then returns to 4 kWh. Each interval respects the entered reserve and the final departure target.

Stored Energy Returns To The Target. Bidirectional example · interval boundaries · UTC. kWh.
Bidirectional example · interval boundaries · UTC. The entered minimum reserve and closing target are both 4 kWh.

Build A Fleet Study

Set the usable vehicle energy, reserve, charge power, charger groups and connection sessions. Enter site demand, generation and time-aligned import and export prices. Review the returned schedule alongside departure energy and site power before comparing another set of study inputs.