A connection study needs a time-specific operating envelope. Network Map combines supplied access permissions, equipment ratings, agreement limits and interval instructions into import and export caps that can be reviewed row by row.

Network Map infrastructure view used as geographic context for Connection Access: Trace Each Interval To Its Operating Limit.
Network Map infrastructure context for connection-access studies.

Enter The Agreement And Instructions

This modelled preview was run on 8 November 2026 using an example caller-supplied agreement. The study covers three hourly intervals from 00:00 to 03:00 UTC on 25 October 2026. The input timezone is Europe/London; the charts below retain the returned UTC interval labels.

The input import rating is 100 kW. The entered firm and flexible components are 40 kW and 60 kW, and the agreement cap is 90 kW. The three supplied import instructions are 200 kW, 20 kW and 60 kW. The export-permission input is disabled.

Read The Returned Operating Envelope

The preview returns import caps of 90 kW, 20 kW and 60 kW. Each row reports the active rule category. The first interval is bounded by the agreement. The next intervals follow the supplied operating instructions. Returned export capacity is zero throughout the entered permission window.

Instructions And Returned Import Caps. Modelled access preview · 25 October 2026 · UTC. kW.
Modelled access preview · 25 October 2026 · UTC. Caller-supplied agreement and dynamic-instruction example. Returned export caps are zero.

Explore Network Map

Trace The Binding Limit

In the first interval, the 200 kW instruction sits above both the 100 kW equipment rating and the 90 kW agreement cap. The preview retains the 90 kW agreement bound. In the second interval, the 20 kW instruction becomes the returned cap, below the entered 40 kW firm component.

This row-level view connects the effective operating envelope to the exact study inputs. It makes the agreement and instruction references part of the review, alongside the numerical limit.

The First Interval Retains The Agreement Cap. Modelled access preview · 00:00–01:00 UTC. kW.
Modelled access preview · 00:00–01:00 UTC. Firm plus flexible is the derived sum 40 + 60 kW. The response identifies agreement as the binding rule.

Use The Envelope In A Project Study

Bring the dated agreement, permission windows and operating instructions into the study. Check the returned caps before developing generation, storage or flexible-load schedules. Read the Dispatch, Calendars And Sizing guide and the wider Project Modelling workflow.