Market analysis of 8 November 2026
Backup-supply studies become clearer when each option faces the same demand and outage trace. Network Map compares the delivered energy, fuel balance and operating cost of supplied generator and fuel-cell plans against a grid-only case.

Keep The Demand Trace Common
This modelled example was run on 8 November 2026 using caller-supplied equipment and fuel assumptions. The study interval is 00:00–01:00 UTC on 1 January 2026. Grid supply is unavailable in that interval. Critical load is 4 kW and noncritical load is 2 kW.
Both equipment options have a 10 kW rating and a 10 kW connection limit. The entered assumptions permit islanding and use zero transfer delay. Each option starts with fuel already in its tank.
Review Critical And Noncritical Energy
The generator and fuel-cell cases each produce 6 kWh. Each serves all 4 kWh of critical demand and all 2 kWh of noncritical demand. The grid-only comparison returns 4 kWh of unserved critical energy and 2 kWh of unserved noncritical energy for the same outage interval.

Follow Fuel Use And Operating Cost
The example generator consumes 1.20 litres of its entered liquid fuel and closes with 8.80 litres. Its returned operating cost is AUD 11.60: AUD 3.60 for fuel, AUD 6.00 for variable output cost and AUD 2.00 for the running hour.
The example fuel cell consumes about 0.3600 kg of hydrogen and closes with about 0.6400 kg. Its returned operating cost is AUD 10.88 after rounding: about AUD 2.88 for fuel, AUD 6.00 for variable output cost and AUD 2.00 for the running hour. These are horizon operating costs for the supplied conversion curves, fuel properties and prices.

Build The Comparison From Site Inputs
Enter the critical and noncritical loads, outage windows, available grid power, equipment limits and fuel stocks. Add the conversion curves and cost inputs. Review served energy first, then inspect the fuel and operating-cost ledgers for the same horizon.
Use Asset Screening within Project Modelling to develop the comparison from your own site assumptions.