Market analysis of 7 November 2026
A battery study has an information problem and an energy problem. The controller chooses an action from the information available to it. The physical system must then deliver that action within its power, energy and connection limits. Keeping those boundaries separate makes a dispatch result easier to interpret.
The examples below come from Network Map Project Modelling documentation and a saved run calculated on 7 November 2026. Annual figures describe the modelled 2026 case.
Start With The Physical Case
Our North depot example has 2 kW of solar and a 2 kW / 4 kWh battery. Annual load is 8,760 kWh. The import value is AUD 0.25/kWh and the export value is AUD 0.08/kWh. Those inputs give the dispatch calculation a defined site, energy balance and financial basis.

The battery can move energy between intervals, subject to its operating limits. Its state of charge carries forward. A physical end target requires real charging or discharging to reach the specified inventory, with the associated energy and costs retained in the calculation.
Choose What The Decision Can Know
The documented price experiment uses past observations, a rolling 24-hour horizon and 2 trailing intervals. These settings change the prices used to make decisions. Settlement still uses the case’s settlement prices. This is a useful separation: the controller’s information set is a study input, while the financial ledger follows the realised case axis.
A supplied forecast should have its own timestamps and issue time. For load and generation experiments, Network Map also supports a signed-error assumption based on strictly earlier observations. Record the chosen error assumption with the run to show precisely what the controller knew at each decision.
A full-horizon case answers a different question: how should the supported equipment operate when the supplied horizon is known? Compare that result with a forecast-driven case only after aligning the physical boundaries, objective and terminal inventory.
Read The Saved Result On Its Own Terms
Our saved joint-dispatch run used known full-horizon inputs and a physical terminal energy target. It returned an optimal objective of AUD 1,399.85 for the selected tariff-cost objective. Solar generation was 4,380 kWh and reported onsite use was 3,160.62 kWh.

The reported investment metrics were a modelled NPV of AUD 3,300.69 and an IRR of 40.86%. These values belong to that saved case and its financial assumptions. The tariff-cost objective and NPV answer different questions: one measures the selected operating objective, while the other discounts project cash flows.
No commercial contracts were pinned in this run. Its commercial-settlement contribution was AUD 0. This makes the example a clean demonstration of a tariff-driven operating objective with physical inventory enforced.
Make The Comparison Reproducible
- Keep the load, generation, tariff and equipment version fixed when testing a decision method.
- State whether future prices are known or supplied as a forecast.
- Carry real energy inventory through the comparison and match the end target.
- Retain the saved objective, energy results and financial assumptions together.
Use Dispatch Calendars And Sizing to configure the study. Profiles And Inputs explains timestamped evidence. Compare project assumptions with the separate observed-market view in Battery Revenue Benchmarks.


