Skip to main content

Market analysis of 24 October 2026

A solar project earns its energy value in the intervals when it generates. That makes the timing of output as important as the annual total when estimating wholesale exposure. The daily average price is a useful market summary, but it does not automatically describe the price captured by solar output.

Our example uses Network Map’s stored German solar generation and Germany/Luxembourg day-ahead prices for 24 October 2026 UTC. Both series contain 96 matched quarter-hour observations. The source provider is Bundesnetzagentur | SMARD.de, and the store was imported on 25 October 2026.

Weight Price By The Energy That Occurred

The matched solar series totals 113,629.92 MWh. Peak solar output is 19,324.6 MW at 11:30 UTC. Multiplying each interval’s output by its quarter-hour duration produces energy; multiplying that energy by the matching price produces an interval market-value proxy.

Adding those interval values gives EUR 1,169,275.43, rounded. Dividing by the matched energy gives an output-weighted price of EUR 10.29/MWh. The same day’s time-average price is EUR 28.29/MWh.

Solar Timing Changes The Price Weight. Germany · observed 24 October 2026 UTC. Solar-weighted price: 10.29 EUR/MWh; Time-average price: 28.29 EUR/MWh.
Germany · observed 24 October 2026 UTC. 96 matched price/output intervals. National solar output valued at day-ahead prices. Source: Network Map.

Explore Project Modelling

These figures describe national solar output valued at the selected wholesale price. A plant’s contract, loss adjustment and other commercial terms belong in its own ledger. Here, the matched series isolates the relationship between production timing and price.

Hold Energy Constant To Isolate Shape

For a transparent arithmetic comparator, spread the same 113,629.92 MWh evenly across the day. That creates a constant 4,734.58 MW profile. It includes nighttime output, so it is a reference shape rather than a feasible solar schedule or a typical weather year.

Valuing that flat profile against exactly the same 96 observed prices gives EUR 3,214,412.89. Its energy-weighted price equals the time average, EUR 28.29/MWh, because each interval carries the same energy weight. The observed solar shape gives EUR 1,169,275.43 on the same total energy.

Same Energy, Different Timing Weights. Observed solar versus derived flat-output comparator. Observed solar shape: 1.17 EUR million; Derived flat shape: 3.21 EUR million.
Observed solar versus derived flat-output comparator. Both use 113,629.92 MWh. The flat-output reference includes night hours. Source: Network Map.

The derived difference is EUR 2,045,137.46. This comparison holds volume and prices constant, changing only the timing weights. The derived arithmetic comparison isolates the timing effect using a flat reference profile.

Carry Chronology Into Weather-Based Studies

The example explains why a weather-derived generation profile should stay aligned with the price axis. Moving output between intervals changes which prices receive the largest weights. A representative weather shape and a chronological weather series answer different questions when paired with the same price history.

Network Map’s separate weather-conversion guide shows how explicit solar and wind equipment inputs turn a complete weather year into generation intervals. In a project study, retain the weather source, equipment version, timezone and electrical time axis together. That keeps any change in the captured price traceable to the changed assumptions.

This observed German day shows how timing changes captured value. To compare chronological and typical weather years directly, match site equipment, energy treatment and price coverage.

Review Yield And Captured Value Together

  • Check total energy before comparing value.
  • Join generation and price by exact interval timestamps.
  • Use energy weights for captured price and time weights for the market average.
  • Label any constructed comparison shape and keep its arithmetic visible.

Explore the source context in International Markets and the conversion workflow in Asset Screening. Markets provides the price view, while Contract Settlement connects a project’s energy to its commercial terms.

Start Your Project Study