Skip to main content

Interconnector analysis, February to October 2026

Australia’s eastern states trade electricity every five minutes over a chain of interconnectors: Queensland to New South Wales, New South Wales to Victoria, Victoria to South Australia and Tasmania to Victoria. When a link has spare room, prices on both sides move together. When it hits its limit, the regions separate and each one sets its own price.

Network Map holds every five-minute flow and limit on every interconnector, matched to the regional prices on both sides. These eight charts, plus a bonus scatter, show how much power each corridor carries, which way it flows by hour and by month, how often it runs at its limit and what that does to prices.

Chart 1: Victoria To New South Wales Carries The Most Power

Chart 1 shows the median daily peak flow in each direction on the four main corridors from February to October 2026. On a typical day the Victoria to New South Wales link peaked at 981 MW northbound and 541 MW southbound. It ran in both directions on 94% of days, and its largest single flows were 1,523 MW north and 1,830 MW south.

The New South Wales to Queensland link is mostly a southbound corridor: its median daily peak was 938 MW from Queensland into New South Wales, against 119 MW the other way. Victoria to South Australia peaked at 570 MW westbound and 341 MW eastbound. Tasmania to Victoria peaked at 192 MW into Victoria and 255 MW into Tasmania, and ran both ways on 49% of days.

Bar chart of median daily peak flow in each direction on the main interconnectors
Median across market days of the daily maximum flow in each direction. Source: Network Map.

Chart 2: Queensland Exports South Every Day, Most From July

Chart 2 tracks the two northern corridors by month. Queensland’s southbound peak was around 760 MW a day from February to April and 590 MW in May and June. From July it stepped up to 1,168 MW and stayed above 1,000 MW through October. In July and August the corridor barely ran north at all.

The Victoria to New South Wales link peaked at more than 1,000 MW northbound in most months, from 1,128 MW in February to 1,105 MW in June. In spring the balance shifted. By October the northbound peak had eased to 783 MW and the southbound peak had grown to 742 MW, as New South Wales sent more power south during the day.

Grouped bar chart of monthly peak flows on the northern corridors
Median daily maximum flow in each direction, by month. Source: Network Map.

Chart 3: Tasmania Imported In Autumn And Exported From July

Chart 3 shows the southern corridors. Tasmania to Victoria shows the clearest seasonal switch. From February to April the link mostly ran into Tasmania, with a daily peak of about 207 MW and almost no flow north. In July Tasmania began exporting, with a median daily peak of 456 MW into Victoria, and from August it ran both ways most days. The switch lines up with the mainland winter price peak in June and July (see the price analysis in this series).

Victoria to South Australia carried 640 MW westbound at the daily peak in February and 618 MW in July. Eastbound flows into Victoria were largest in September and October, at 479 and 452 MW, when South Australian wind and solar were strongest.

Grouped bar chart of monthly peak flows on the southern corridors
Median daily maximum flow in each direction, by month. Source: Network Map.

Chart 4: Victoria Sends Power North At Night, Not At Midday

Chart 4 shows the average flow by hour of day on the days Network Map holds at full five-minute resolution in 2026. The Victoria to New South Wales link averaged 672 MW northbound in the early morning hours. After 7am the flow fell away, and between 9am and 4pm it turned southbound, by up to 80 MW on average, as New South Wales solar came online. By 6pm it was back above 500 MW northbound.

Queensland exported south at every hour of the day, averaging between 308 and 541 MW. Its peak export came late in the evening. Victoria to South Australia averaged its highest westbound flow, 157 MW, in the late afternoon. Tasmania imported on average at every hour, most strongly around midday, when it took 126 MW.

Line chart of average flow by hour of day on the main interconnectors
Five-minute flows on the days held at full resolution in 2026. Source: Network Map.

See Interconnector Flows In Network Map

Chart 5: Limits Move Every Five Minutes

Each interconnector has an export limit and an import limit, and both are recalculated every five minutes from the state of the network, the weather and the generators online. Chart 5 shows Victoria to South Australia on 12 October 2026. The flow swung between 600 MW eastbound and 552 MW westbound across the day. The import limit ranged from 376 to 600 MW.

The flow sat on one edge of its allowed band for 82 of the day’s 288 intervals. The typical limits on the main corridors were 640 MW northbound and 609 MW southbound for Victoria to New South Wales, and 1,003 MW southbound for Queensland to New South Wales. The limit for a given interval can sit far below the rated capacity of the line.

Losses are the other cost of moving power. Across the matched days, the Victoria to New South Wales link lost an average of 38 MW in transit and the New South Wales to Queensland link 37 MW. Victoria to South Australia lost 19 MW. Losses rise with flow, so the far end of a long, busy corridor receives less than the near end sends. That is one reason prices differ slightly between regions even when no limit binds.

Line chart of Victoria to South Australia flow and its limits on 12 October 2026
Dispatch flow and the export and import limits for each five-minute interval. Source: Network Map.

Three of the six links are direct current (DC) links. One runs between Victoria and South Australia alongside the main alternating current corridor, one between New South Wales and Queensland, and the third is Tasmania’s only link to the mainland, a cable under Bass Strait. A DC link is controlled to a set flow rather than following the physics of the network, so it can be scheduled to relieve the parallel corridor.

Chart 6: Interconnectors Run At Their Limit A Third Of The Time

Chart 6 counts the share of five-minute intervals in which the flow was within 1 MW of its limit. The Victoria to New South Wales link was at its limit in 45% of intervals, almost all of them northbound. Victoria to South Australia was at its limit 43% of the time, 32% westbound and 11% eastbound. The smaller DC link between Victoria and South Australia was at its limit 50% of the time.

The New South Wales to Queensland link was at its limit 38% of the time, more often southbound (25%) than northbound (14%). The DC link between the two states was at its limit 30% of the time. Tasmania to Victoria was at its limit 21% of the time, mostly when importing into Tasmania. A corridor at its limit can carry no more power, so the regions on each side must balance on their own.

Horizontal bar chart of the share of intervals at the limit by interconnector
Flow within 1 MW of the limit for that interval, five-minute days in 2026. Source: Network Map.

Chart 7: Prices Split When A Corridor Hits Its Limit

Chart 7 matches every five-minute flow with the prices in the two connected regions. When the Victoria to South Australia link was below its limit, the median price gap between the two regions was A$3.7/MWh. At the limit it rose to A$38.8/MWh, more than ten times as much. The gap exceeded A$50/MWh in 46% of intervals at the limit, against 11% below it.

The pattern holds on the other corridors. For Victoria to New South Wales the median gap went from A$11.8/MWh below the limit to A$63.0/MWh at it. For New South Wales to Queensland it went from A$7.8 to A$32.9/MWh, and on the DC link from A$11.0 to A$27.7/MWh. Price separation is the clearest signal of where the grid needs more transfer capacity, and it is where a generator’s location changes the price it receives.

Grouped bar chart of median price gap at and below the limit by corridor
Five-minute regional prices matched to five-minute flows. Source: Network Map.

Chart 8: New South Wales Imports Around The Clock

Chart 8 shows each region’s net interchange: the sum of all its interconnector flows. A positive value means the region exports. New South Wales imported at every hour, with an average of 702 MW across the day and more than 1,000 MW overnight. Queensland exported an average of 493 MW, and Victoria 428 MW, rising to 787 MW in the early morning.

South Australia was a net importer on average, with its largest imports, about 207 MW, in the morning hours. Tasmania imported during the day and exported in the evening, with up to 92 MW in the evening peak. The picture is of a grid where New South Wales draws on its neighbours around the clock, which makes the corridors into New South Wales the most valuable in the system.

Line chart of average net interchange by region and hour of day
Five-minute net interchange on the market days held at full resolution. Positive values are net exports. Source: Network Map.

Bonus Chart: Big Price Gaps Only Open At The Limit

The bonus chart plots every matched five-minute interval on the Victoria to South Australia link. Below the limit, points cluster tightly around a zero price gap whatever the flow. The large gaps, in both directions, sit almost entirely at the flow limits. When South Australia is short, its price rises above Victoria’s at the westbound limit. When South Australia has surplus wind and solar, its price falls below Victoria’s at the eastbound limit.

Scatter chart of Victoria to South Australia flow against the price gap between the regions
Five-minute intervals on the days both flows and prices are held. Source: Network Map.

What This Means For A New Project

Interconnector data answers practical questions for developers, traders and large energy users:

  1. Which price will I see? If the corridor next to your region is often at its limit, your regional price will separate from your neighbour’s. Price your project at its own region, not at a national average.
  2. Which hours are exposed? Check the hours when the corridor next to your site binds. If it binds in the hours you export, your regional price separates from your neighbour’s in exactly those hours, for better or worse.
  3. Where is transfer capacity worth most? The corridors into New South Wales run at their limit most often, and the price gap there is largest. Storage and generation on the importing side of a binding corridor earn the most from that gap.
  4. What changes with the seasons? Queensland exports more from July and Tasmania switches direction during the year. Model a full year, not a single season.

What It All Means

  • Power flows both ways. The Victoria to New South Wales link ran in both directions on 94% of days, and its direction follows the solar day.
  • Queensland and Victoria supply New South Wales. New South Wales imported an average of 702 MW, at every hour of the day.
  • Limits bind often. The main corridors were at their limit for 38% to 45% of intervals, and limits change every five minutes.
  • Limits split prices. At the limit, the median price gap between Victoria and South Australia rose from A$3.7 to A$38.8/MWh.
  • Location sets value. A project on the importing side of a binding corridor earns the higher regional price.

Model It In Network Map

Network Map shows interconnector flows, limits and regional prices on the map and in the market views. See where the grid is full, compare regional prices hour by hour and model a project at the connection point that captures the spread.

Sign Up To Explore Market Insights

Every figure comes from Network Map market data: five-minute interconnector flows and limits, five-minute regional prices and net interchange for February to October 2026.

Explore The Data