Generator analysis, 19 to 23 November 2026
For five evenings from Thursday 19 November 2026, Queensland’s Kogan Creek Power Station had much the same output between 8 pm and 10 pm: each evening’s median was within 2 MW of 320 MW. Come back at lunchtime on those same days and the picture changes. The midday median was 720 MW on Thursday and 319 MW on Friday.
That split matters because CS Energy’s industrial action notice summary describes two different limits on the unit’s output, among other notified bans. It does not announce that the station will shut down. Here is what the Australian Energy Market Operator (AEMO) measured inside each window, and why the numbers are not a measure of generation lost.
One unit, two clock settings
Kogan Creek is a single 750 MW coal-fired unit near Chinchilla. CS Energy says it received notices of protected industrial action during negotiations for a new enterprise agreement. From 19 November to 3 December, the notified daytime ban covers operating below 720 MW or maximum available capability, between 10:30 am and 2:30 pm. A separate ban covers operating above 320 MW from 5 pm to 8 am, with dates listed as 19 November to 4 December.
To look well inside those windows, we took readings from noon to just before 2 pm and from 8 pm to just before 10 pm. CS Energy still listed both limits on 26 November; our comparison ends on Monday 23 November so that it covers the same five days of the week, Thursday to Monday, as the week before. All measurement times are Queensland time, the same as NEM market time (UTC+10).
Friday puts the daytime figure in perspective
On Friday 20 November, the next-day dispatch record adds something the output trace cannot. For all 24 intervals from noon to 2 pm, AEMO recorded 320 MW as both the unit’s offered availability and its dispatch target. At noon the measured output was 317 MW; 320 MW was the instruction for the end of the interval at 12:05 pm. Neither number tells us why the available amount was 320 MW that day. The daytime notice is not a promise of 720 MW.
Even in the steady evening window, 320 MW was not a constant reading. Friday evening’s samples ranged from 310 to 335 MW.
The prior week also cautions against attributing every low reading to industrial action. Even before 19 November, Saturday and Sunday evening medians were both about 321 MW. On the preceding Thursday and Friday evenings every reading in our two-hour windows was zero; on Monday the median was 719 MW. Subtracting that week’s output from the next would not tell us what Kogan Creek would have produced without the action.
How to read the figures
AEMO identifies the station’s dispatchable unit as KPP_1. Its SCADA field is an instantaneous power reading at the start of a five-minute interval, not electricity produced over five minutes. We used the median: sort the 24 readings in each window and take the average of the middle two. That describes a typical level, not every moment in those two hours. For a follow-up, Network Map’s Unit Operations view takes a unit and region: select KPP_1 and QLD1 to check output alongside operating and market information.