Battery economics from December 2025 to October 2026
Every grid battery business case comes down to one question: how much margin does each megawatt earn in a year, and does that repay what it cost to build? Network Map tracks every grid battery unit with dispatch data, every five-minute charge and discharge and the regional price at that moment. That lets us answer the question with the fleet’s real numbers rather than a model alone.
These ten charts cover 335 market days from December 2025 to October 2026. They work from the fleet’s total margin down to margin per MWh, per unit and per MW. They show how many days decide the year, how close real batteries get to the theoretical best, how the regions compare and what installed cost a given payback period can carry. Every estimate is labelled, and the arithmetic is shown so you can repeat it with your own numbers.
Chart 1: The Fleet Earned An Estimated A$317 Million In 11 Months
From December 2025 to October 2026 the grid battery fleet earned an estimated A$296.8 million from energy arbitrage: discharge revenue minus the cost of charging, both valued at the five-minute regional price. Ancillary services added A$19.8 million, about 6% of the total. That makes energy arbitrage the main source of margin, with ancillary services a steady extra.
January 2026 was the standout month with A$54.9 million of energy margin. May was the low point at A$13.9 million. From May the total climbed every month, to A$36.8 million in October.

Chart 2: Each MWh Discharged Earned A$74 On Average
Fleet totals grow as new units join, so the first unit-level test is margin per MWh discharged. Over the 11 months the fleet discharged 4,038 GWh, so the arithmetic is:
A$296.8 million / 4,037,580 MWh = A$73.50 per MWh discharged.
This number already includes charging cost and round-trip losses, because it is net margin divided by discharged energy. It ranged from A$39/MWh in May to A$214/MWh in January. In October it was A$78/MWh, its highest level since February. Ancillary services were worth another A$4.91 per MWh discharged across the period.

Chart 3: About A$54 Thousand Per MW Per Year From Energy
To turn margin per MWh into margin per MW, you need a duration and a cycling rate. For a 2-hour battery that completes one full cycle a day, each MW discharges 2 MWh a day. This is an estimate, and the method is:
A$73.50/MWh x 2 MWh per MW per day x 365 days = A$53,658 per MW per year.
Adding ancillary services at A$4.91/MWh gives A$57,241 per MW per year. By month, the annualised energy figure ran from A$29 thousand (May) to A$156 thousand (January). Monthly figures swing widely, which is why a business case should use at least a full year of data, not a single season.

Chart 4: The Average Battery Earned A$5.4 Million A Year
Chart 4 divides the fleet margin by the average number of units dispatching each day. Across the period there were 20,013 unit-days, so:
A$296.8 million / 20,013 unit-days x 365 = A$5.41 million per unit per year.
The fleet grew from 51 to 68 units in the period. Per-unit margin fell from A$1,068 thousand in January to A$235 thousand in May, then rose every month to A$541 thousand in October, even as more units joined. The average unit discharged 202 MWh a day, so this is a fleet of large, grid-scale batteries.

Benchmark Battery Margins In Network Map
Chart 5: The Best 78 Days Earned Half The Margin
Battery margin is concentrated in a small number of days. Chart 5 ranks all 335 days from best to worst. The single best day earned 6.5% of the 11-month margin. The best 5 days earned 14%, the best 20 earned 26% and the best 78 days, less than a quarter of the period, earned half.
The other side matters as well. The median day earned A$0.71 million against a mean of A$0.89 million, and only 8 days of 335 had a negative fleet margin. The base is steady and positive, and the big days are the upside.

Chart 6: 26 January Alone Earned A$19.4 Million
The ten best days earned a combined A$56.8 million. 26 January stands out at A$19.4 million, about 27 times a median day. The list also includes 10 January (A$7.2 million), 12 October (A$6.4 million) and 8 July (A$4.4 million). The big days fall in summer heat, in winter evening peaks and in spring, so they are not a single seasonal event.
A battery that is offline, or already empty, on days like these misses a large part of its year. Availability, maintenance timing and state-of-charge strategy on high-risk days are as important to the business case as size and duration.

Chart 7: A Perfect 2-Hour Battery Earns Most In South Australia
To compare regions fairly, we built a reference battery: 1 MW and 2 MWh, one cycle a day, 85% round-trip efficiency and perfect foresight of the day’s prices. Each day it charges in the 24 lowest five-minute prices and discharges in the 24 highest. This is an estimate, and the daily formula is:
Margin per MW = 2 MWh x (average of the top 24 prices) – (2 MWh / 0.85) x (average of the bottom 24 prices).
Across 59 market days held at five-minute resolution, the median daily result was A$350 per MW in South Australia, A$259 in Victoria, A$212 in Queensland, A$196 in New South Wales and A$158 in Tasmania. The average day is much higher than the median in South Australia (A$1,208) and New South Wales (A$782), because spike days lift the average.

Chart 8: Real Batteries Capture About Half The Perfect Spread
No real battery knows the day’s prices in advance. Chart 8 compares the fleet’s realised margin per MWh discharged in each region with the reference battery’s perfect spread on the same day:
Capture rate = realised margin per MWh discharged / (average top-24 price – average bottom-24 price / 0.85).
Across 32 region-days the median capture rate was 53%, and the middle half of days ranged from 32% to 69%. Queensland batteries captured the most, 67%, followed by New South Wales (54%), South Australia (39%) and Victoria (36%). Regions with sharp, short spikes have lower capture rates, because a 2-hour battery cannot sell every MWh at the peak price. The gap between capture rates is the value of better bidding and forecasting.

Chart 9: New South Wales And South Australia Lead On Margin Per MW
Chart 9 puts the pieces together for each region. First, the reference battery’s margin is scaled to every complete day from February to October from that day’s price spread, then annualised. For example, in South Australia the reference battery earned 1.18 times the daily spread on the five-minute days. Applying that ratio to all 273 days gives A$182,778 per MW, so:
A$182,778 / 273 days x 365 = A$244,374 per MW per year theoretical; x 39% capture = A$96,179 per MW per year.
The same method gives A$122,881 per MW per year in New South Wales, A$53,671 in Queensland and A$41,785 in Victoria. New South Wales and South Australia lead because their spike days are frequent and large. Queensland and Victoria earn more evenly across the year, which gives a steadier cash flow. Tasmania’s theoretical best is A$133,510 per MW per year.

Chart 10: What Installed Cost Each Payback Period Can Carry
Simple payback is installed cost divided by annual margin. Turned around, the annual margin per MW tells you the most a project can cost per MW to pay back within a target period:
Maximum installed cost per MW = annual margin per MW x payback years.
At the fleet average of A$57,241 per MW per year (energy plus ancillary services), a 10-year payback carries A$572 thousand per MW and a 15-year payback A$859 thousand. In New South Wales, at A$122,881, a 10-year payback carries A$1.23 million per MW. In South Australia it carries A$962 thousand. In Victoria it carries A$418 thousand.
To use the chart, take your installed cost quote per MW and divide it by the annual margin for your region. For example, a quote of A$1.2 million per MW in New South Wales gives A$1,200,000 / A$122,881 = 9.8 years. These are simple paybacks on wholesale margin, before network charges, operating costs and degradation, and before contracted revenue or capacity payments, which can shorten them.

A Worked Example: 100 MW / 200 MWh In New South Wales
Here is the full chain for an example project, using the figures above. The battery is 100 MW with 200 MWh of storage and one cycle a day.
- Theoretical best. The reference battery’s annualised margin in New South Wales is A$228,344 per MW per year (Chart 9).
- Capture. At the region’s median capture rate of 54% (Chart 8), that is A$122,881 per MW per year.
- Project margin. 100 MW x A$122,881 = A$12.3 million per year of estimated wholesale energy margin.
- Cross-check. The same project at the fleet-wide A$73.50/MWh would earn 200 MWh x 365 x A$73.50 = A$5.4 million. The gap between the two shows how much New South Wales spike days add above the fleet average.
- Payback. Divide your installed cost by the project margin. Each A$100 million of installed cost takes 8.1 years to repay at the regional estimate, and 18.6 years at the fleet average.
Swap in your own region, duration and capture rate to test a different project. The method stays the same, so the result is easy to audit and update as new months of data arrive.
What It All Means
- Start from A$74 per MWh. That is what the real fleet earned per MWh discharged, net of charging. Multiply by MWh per MW per day and by 365 to get your margin per MW.
- Region sets the ceiling. Estimated margin per MW per year ranges from A$42 thousand in Victoria to A$123 thousand in New South Wales. The same battery is a different investment in each region.
- Capture rate is the lever you control. Real batteries capture 32% to 69% of the perfect spread on most days. Each extra 10 points is worth about a fifth more margin.
- Be ready for the big days. 78 days earned half the margin. Plan availability and state of charge around them.
- Work back from cost. Multiply annual margin per MW by your target payback years. If your quote is below that number, the project stacks up on wholesale margin alone.
Model It In Network Map
Network Map puts these numbers at your fingertips. Benchmark every grid battery, compare spreads and capture by region, check curtailment and grid constraints near a site, and model a battery at your chosen connection point with your own cost and duration.
Every figure comes from Network Map market data: five-minute dispatch, charge and discharge for grid battery units, five-minute regional prices and ancillary service revenue. Margins are estimated using regional prices, before network charges and operating costs.