Market analysis of 31 October 2026

The Victoria–South Australia (Heywood) interconnector carried a peak dispatch flow of 600.00 MW on 31 October 2026, flowing from Victoria to South Australia. Positive flow, from Victoria towards South Australia, applied in 144 of 288 five-minute intervals (12.0 hours); flow ran the other way in 144 intervals (12.0 hours).

The highest flow towards South Australia was 600.00 MW at 21:20, and the strongest flow towards Victoria was 600.00 MW at 07:35. Published losses on the link peaked at 53.00 MW.

Flow Against The Transfer Limits

The first chart plots five-minute dispatch flow with the export and import limits that applied in each interval, in fixed UTC+10. Where the flow line meets a limit, the link was running at the transfer capability set for that interval, and regional prices can separate.

Victoria–South Australia Flow And Limits — 31 October 2026; 2026-10-31 | Five-Minute Dispatch | MW | UTC+10
Victoria–South Australia (Heywood) flow and limits on 2026-10-31. Source: Network Map; MW, fixed UTC+10.

The Wider Interconnector Picture

The second chart shows metered flow on the link and its published losses through the day.

Metered Flow And Losses — 31 October 2026; 2026-10-31 | Five-Minute | MW | UTC+10
Victoria–South Australia (Heywood) metered flow and losses on 2026-10-31. Source: Network Map; MW.

Why Transfers Matter For Prices

Interconnector flows link regional prices. When a link is unconstrained, prices in neighbouring regions tend to move together; when it reaches a limit, they can split. For a trader or generator, reading flow against the limits explains why a regional price moved apart from its neighbour.

Figures use Network Map’s five-minute interconnector records dated 31 October 2026, fixed UTC+10. Sign convention: positive flow runs from Victoria to South Australia.

Explore The Data

Markets, Constraint Headroom, Revenue Reconciliation.