Market analysis of 31 October 2026
The Victoria–South Australia (Heywood) interconnector carried a peak dispatch flow of 600.00 MW on 31 October 2026, flowing from Victoria to South Australia. Positive flow, from Victoria towards South Australia, applied in 144 of 288 five-minute intervals (12.0 hours); flow ran the other way in 144 intervals (12.0 hours).
The highest flow towards South Australia was 600.00 MW at 21:20, and the strongest flow towards Victoria was 600.00 MW at 07:35. Published losses on the link peaked at 53.00 MW.
Flow Against The Transfer Limits
The first chart plots five-minute dispatch flow with the export and import limits that applied in each interval, in fixed UTC+10. Where the flow line meets a limit, the link was running at the transfer capability set for that interval, and regional prices can separate.

The Wider Interconnector Picture
The second chart shows metered flow on the link and its published losses through the day.

Why Transfers Matter For Prices
Interconnector flows link regional prices. When a link is unconstrained, prices in neighbouring regions tend to move together; when it reaches a limit, they can split. For a trader or generator, reading flow against the limits explains why a regional price moved apart from its neighbour.
Figures use Network Map’s five-minute interconnector records dated 31 October 2026, fixed UTC+10. Sign convention: positive flow runs from Victoria to South Australia.


