Market analysis of 9 October 2026

The New South Wales–Queensland interconnector carried a peak dispatch flow of 1,119.64 MW on 9 October 2026, flowing from Queensland to New South Wales. Positive flow, from New South Wales towards Queensland, applied in 0 of 287 five-minute intervals (0.0 hours); flow ran the other way in 287 intervals (23.9 hours).

The highest flow towards Queensland was -445.38 MW at 21:45, and the strongest flow towards New South Wales was 1,119.64 MW at 05:30. Published losses on the link peaked at 104.80 MW.

Flow Against The Transfer Limits

The first chart plots five-minute dispatch flow with the export and import limits that applied in each interval, in fixed UTC+10. Where the flow line meets a limit, the link was running at the transfer capability set for that interval, and regional prices can separate.

New South Wales–Queensland Flow And Limits — 9 October 2026; 2026-10-09 | Five-Minute Dispatch | MW | UTC+10
New South Wales–Queensland flow and limits on 2026-10-09. Source: Network Map; MW, fixed UTC+10.

The Wider Interconnector Picture

Other links on the same day: Victoria–New South Wales peaked at 810 MW; Victoria–South Australia (Heywood) peaked at 600 MW; Tasmania–Victoria (Basslink) peaked at 438 MW; New South Wales–Queensland (Terranora) peaked at 97 MW; Victoria–South Australia (Murraylink) peaked at 187 MW. The second chart compares the peak absolute flow on each link.

Peak Flow By Interconnector On 9 October — 9 October 2026; 2026-10-09 | Highest Absolute Five-Minute Flow | MW
Peak absolute interconnector flow on 2026-10-09. Source: Network Map; MW.

Why Transfers Matter For Prices

Interconnector flows link regional prices. When a link is unconstrained, prices in neighbouring regions tend to move together; when it reaches a limit, they can split. For a trader or generator, reading flow against the limits explains why a regional price moved apart from its neighbour.

Figures use Network Map’s five-minute interconnector records dated 9 October 2026, fixed UTC+10. Sign convention: positive flow runs from New South Wales to Queensland.