Market analysis of 1 October 2026

The Tasmania–Victoria (Basslink) interconnector carried a peak dispatch flow of 478.00 MW on 1 October 2026, flowing from Tasmania to Victoria. Positive flow, from Tasmania towards Victoria, applied in 253 of 287 five-minute intervals (21.1 hours); flow ran the other way in 32 intervals (2.7 hours).

The highest flow towards Victoria was 478.00 MW at 08:45, and the strongest flow towards Tasmania was 171.80 MW at 07:10. Published losses on the link peaked at 32.57 MW.

Flow Against The Transfer Limits

The first chart plots five-minute dispatch flow with the export and import limits that applied in each interval, in fixed UTC+10. Where the flow line meets a limit, the link was running at the transfer capability set for that interval, and regional prices can separate.

Tasmania–Victoria Flow And Limits — 1 October 2026; 2026-10-01 | Five-Minute Dispatch | MW | UTC+10
Tasmania–Victoria (Basslink) flow and limits on 2026-10-01. Source: Network Map; MW, fixed UTC+10.

The Wider Interconnector Picture

The second chart shows metered flow on the link and its published losses through the day.

Metered Flow And Losses — 1 October 2026; 2026-10-01 | Five-Minute | MW | UTC+10
Tasmania–Victoria (Basslink) metered flow and losses on 2026-10-01. Source: Network Map; MW.

Why Transfers Matter For Prices

Interconnector flows link regional prices. When a link is unconstrained, prices in neighbouring regions tend to move together; when it reaches a limit, they can split. For a trader or generator, reading flow against the limits explains why a regional price moved apart from its neighbour.

Figures use Network Map’s five-minute interconnector records dated 1 October 2026, fixed UTC+10. Sign convention: positive flow runs from Tasmania to Victoria.