Market analysis of 1 June 2026
The high-impact network outage schedule published on 1 June 2026 listed 1 non-withdrawn entry active on 1 June 2026, marked unplanned.
By region, the active entries were: Victoria 1. Counts cover each entry whose scheduled window overlapped the calendar day in fixed UTC+10.
The Outage Load Around The Date
The first chart counts scheduled entries active on each day from 25 May to 8 June 2026, using the same publication. It shows whether 1 June sat inside a busy or a quiet stretch of planned network work.

The Longest Scheduled Windows
The longest active windows on the day were: Koorangie – Wemen 220kV line (Victoria), scheduled from 25 May 2026 11:32 to 8 June 2026 17:00.
The second chart shows the active entries by region.

Why Outage Schedules Matter
Scheduled outages reduce network capability while the work is under way. Interregional entries can lower transfer limits between regions, which links them directly to price separation and to the constraints that bind generators. Reading the schedule by date shows which days carry that exposure.
Figures use the outage schedule snapshot published on 1 June 2026, with withdrawn entries excluded and times in fixed UTC+10.


