Market analysis of 21 May 2026

The high-impact network outage schedule published on 18 May 2026 listed 1 non-withdrawn entry active on 21 May 2026, flagged as interregional.

By region, the active entries were: New South Wales 1. Counts cover each entry whose scheduled window overlapped the calendar day in fixed UTC+10.

The Outage Load Around The Date

The first chart counts scheduled entries active on each day from 14 May to 28 May 2026, using the same publication. It shows whether 21 May sat inside a busy or a quiet stretch of planned network work.

Scheduled Outages Active Each Day — 21 May 2026; 14 May – 28 May 2026 | Non-Withdrawn Entries
Scheduled outage entries active per day around 2026-05-21. Source: Network Map.

The Longest Scheduled Windows

The longest active windows on the day were: Armidale – Sapphire WF (8E) 330 kV Line (New South Wales), scheduled from 12 May 2026 07:13 to 23 May 2026 17:00.

The second chart shows the active entries by region.

Active Outages By Region On 21 May — 21 May 2026; 2026-05-21 | Non-Withdrawn Schedule Entries
Active scheduled outage entries by region on 2026-05-21. Source: Network Map.

Why Outage Schedules Matter

Scheduled outages reduce network capability while the work is under way. Interregional entries can lower transfer limits between regions, which links them directly to price separation and to the constraints that bind generators. Reading the schedule by date shows which days carry that exposure.

Figures use the outage schedule snapshot published on 18 May 2026, with withdrawn entries excluded and times in fixed UTC+10.