The New South Wales–Queensland interconnector carried a peak dispatch flow of 1,244.40 MW on 11 October 2026, flowing from Queensland to New South Wales. Positive flow, from New South Wales towards Queensland, applied in 1 of 288 five-minute intervals (0.1 hours); flow ran the other way in 287 intervals (23.9 hours).
The highest flow towards Queensland was 4.65 MW at 14:20, and the strongest flow towards New South Wales was 1,244.40 MW at 19:20. Published losses on the link peaked at 119.31 MW.
Flow Against The Transfer Limits
The first chart plots five-minute dispatch flow with the export and import limits that applied in each interval, in fixed UTC+10. Where the flow line meets a limit, the link was running at the transfer capability set for that interval, and regional prices can separate.

The Wider Interconnector Picture
Other links on the same day: Victoria–New South Wales peaked at 728 MW; Victoria–South Australia (Heywood) peaked at 573 MW; Tasmania–Victoria (Basslink) peaked at 445 MW; New South Wales–Queensland (Terranora) peaked at 97 MW; Victoria–South Australia (Murraylink) peaked at 181 MW. The second chart compares the peak absolute flow on each link.

Why Transfers Matter For Prices
Interconnector flows link regional prices. When a link is unconstrained, prices in neighbouring regions tend to move together; when it reaches a limit, they can split. For a trader or generator, reading flow against the limits explains why a regional price moved apart from its neighbour.