Market analysis of 4 November 2026

Finley Solar Farm in southern New South Wales was held at zero output for six five-minute intervals at dawn on 4 November 2026. From the 05:30 interval to the 05:55 interval, the farm’s dispatch target was 0 MW under a semi-dispatch cap. Its forecast availability rose from 0.1 MW to 13.5 MW over the same period.

A market notice records a direction to disconnect the farm’s inverters at 05:52 to maintain system strength in New South Wales. The direction and the related intervention event were cancelled from 06:10.

Network Map’s curtailment data assigns these six intervals to a network cause: a constraint for the farm’s inverters. The farm returned to dispatch from the 06:00 interval, at 5.1 MW, and reached 27.9 MW by 06:40.

Output Against Availability

The first chart compares the farm’s forecast availability with its dispatch target from 04:30 to 09:00. The gap before 06:00 is energy the farm could have produced but was not dispatched to produce.

Finley Solar Farm availability and dispatch target, 04:30 to 09:00 on 4 November 2026; five-minute, MW, UTC+10
Finley Solar Farm availability and dispatch target, 04:30 to 09:00 on 4 November 2026. Source: Network Map; MW, fixed UTC+10.

How Much Was Curtailed

Across the day, 7 of 288 intervals were curtailed, for a total of 3.3 MWh. The six dawn intervals account for 2.5 MWh, with the largest loss of 13.5 MW at 05:55. A seventh interval, at 07:10, was curtailed by 9.8 MW without a named constraint.

Finley Solar Farm curtailed MW in each of seven five-minute intervals on 4 November 2026
Finley Solar Farm curtailed output in each curtailed interval on 4 November 2026. Source: Network Map; MW.

The Rest Of The Day

The farm dispatched 493 MWh on 4 November and peaked at 65.8 MW at 14:55. During the dawn hold, the New South Wales price was between $96.00/MWh and $120.78/MWh. The day’s average was $84.98/MWh.

Network Map Bid to Dispatch view for Finley Solar Farm on 4 November 2026, showing offers, dispatch and regional price
The Bid to Dispatch view in Network Map for Finley Solar Farm on 4 November 2026. The shaded bands mark the curtailed intervals.
Network Map table of the seven constrained and curtailed intervals for Finley Solar Farm on 4 November 2026
The constrained and curtailed intervals table for Finley Solar Farm on 4 November 2026, in Network Map.

Why It Matters

System strength events can remove a solar farm from dispatch for short periods, even when the farm has energy to give. The cost here was small because the event happened at dawn. A similar event at midday could affect far more energy. Interval-level curtailment data shows when this happens, why, and how much energy was lost.

Figures use Network Map’s five-minute dispatch, availability and curtailment records for 4 November 2026, fixed UTC+10. Times are interval end times.