Market analysis of 19 October 2026
The Victoria–New South Wales interconnector carried a peak dispatch flow of 1,203.63 MW on 19 October 2026, flowing from Victoria to New South Wales. Positive flow, from Victoria towards New South Wales, applied in 173 of 288 five-minute intervals (14.4 hours); flow ran the other way in 115 intervals (9.6 hours).
The highest flow towards New South Wales was 1,203.63 MW at 18:45, and the strongest flow towards Victoria was 319.42 MW at 12:55. Published losses on the link peaked at 129.06 MW.
Flow Against The Transfer Limits
The first chart plots five-minute dispatch flow with the export and import limits that applied in each interval, in fixed UTC+10. Where the flow line meets a limit, the link was running at the transfer capability set for that interval, and regional prices can separate.

The Wider Interconnector Picture
Other links on the same day: New South Wales–Queensland peaked at 671 MW; Victoria–South Australia (Heywood) peaked at 578 MW; Tasmania–Victoria (Basslink) peaked at 452 MW; New South Wales–Queensland (Terranora) peaked at 33 MW; Victoria–South Australia (Murraylink) peaked at 182 MW. The second chart compares the peak absolute flow on each link.

Why Transfers Matter For Prices
Interconnector flows link regional prices. When a link is unconstrained, prices in neighbouring regions tend to move together; when it reaches a limit, they can split. For a trader or generator, reading flow against the limits explains why a regional price moved apart from its neighbour.
Figures use Network Map’s five-minute interconnector records dated 19 October 2026, fixed UTC+10. Sign convention: positive flow runs from Victoria to New South Wales.