Market analysis of 5 November 2025
The high-impact network outage schedule published on 3 November 2025 listed 3 non-withdrawn entries active on 5 November 2025. 2 of them carried the interregional flag.
By region, the active entries were: New South Wales 1, Queensland 1, South Australia 1. Counts cover each entry whose scheduled window overlapped the calendar day in fixed UTC+10.
The Outage Load Around The Date
The first chart counts scheduled entries active on each day from 29 October to 12 November 2025, using the same publication. It shows whether 5 November sat inside a busy or a quiet stretch of planned network work.

The Longest Scheduled Windows
The longest active windows on the day were: Armidale – Dumaresq (8C) 330 kV Line (New South Wales), scheduled from 28 October 2025 06:07 to 8 November 2025 16:00; Broadsound – Nebo (834) 275 kV Line (Queensland), scheduled from 3 November 2025 08:00 to 7 November 2025 17:00; Tailem Bend – Tungkillo No.2 275 kV Line (South Australia), scheduled from 5 November 2025 19:30 to 6 November 2025 04:30.
The second chart shows the active entries by region.

Why Outage Schedules Matter
Scheduled outages reduce network capability while the work is under way. Interregional entries can lower transfer limits between regions, which links them directly to price separation and to the constraints that bind generators. Reading the schedule by date shows which days carry that exposure.
Figures use the outage schedule snapshot published on 3 November 2025, with withdrawn entries excluded and times in fixed UTC+10.